MARSHFIELD BUILDING DEPARTMENT PERMIT FEES AS OF NOVEMBER 1, 2018
* Please note that any work started without the benefit of a permit will result in a double permit fee.
* When an inspection is requested and the work is not ready, the premises locked or not accessible by means of a set of stairs, or the work is disapproved, a reinspection fee of $40.00 will be charged.
Please click a permit fee link below to be taken directly to that permit fee schedule.
Building Permit Fees | Electrical Permit Fees | Plumbing and Gas Permit Fees |
Sheet Metal Permit Fees | Fire Sprinkler Permit Fees | Tent Permit Fees |
Permit Fees, Generally
$11.00 per $1,000.00 of calculated Residential Construction cost ($40.00 Minimum)
$13.00 per $1,000.00 of calculated Commercial Construction cost ($80.00 Minimum)
Re-Side/Re-Roof ($40.00 Minimum) Residential $ Total Project Cost X $10.00 per $1,000.00 Top of Page
Re-Side/Re-Roof ($80.00 Minimum) Commercial $ Total Project Cost X $12.00 per $1,000.00
Windows/Doors ($80.00 Minimum) Commercial $ Total Project Cost X $12.00 per $1,000.00
Swimming Pool, Residential $ Total Project Cost X $10.00 per $1,000.00
Swimming Pool, Commercial $ Total Project Cost X $12.00 per $1,000.00
Chimney $50.00
Construction Trailer $50.00
Demolition Permit, Residential $120.00
Demolition Permit, Commercial $170.00
Floodplain Permit $50.00
Occupancy Permit, Residential $40.00
Occupancy Permit, Temporary, Residential $40.00
Occupancy Permit, Commercial $80.00
Occupancy Permit, Temporary, Commercial $80.00
Relocate Building, Residential $ Total Project Cost X $10.00 per $1,000.00
Relocate Building, Commercial $ Total Project Cost X $12.00 per $1,000.00
Reinspection Fee $40.00
Renew Permit 25% of Prior Permit Fee
Site Inspection $75.00
(Building, Electrical & Plumbing/Gas Inspectors)
Change of Contractor Fee $40.00
Mechanical Permit Fee $ Total Project Cost X $11.00 per $1,000.00
Sign Permit Fee Total Square Feet X $5.00 per Square Feet
Wood Stove Permit Fee $50.00
DBA Certificate Review $10.00
Residential Lot of Record $200.00
Permit Fees May Also Be Calculated by Square Footage by Building Commissioner
New Construction Commercial $ Total Project Cost X $95.00 per Square Feet
New Construction Industrial $ Total Project Cost X $95.00 per Square Feet
New Construction Residential $ Total Project Cost X $110.00 per Square Feet
Additions Commercial $ Total Project Cost X $95.00 per Square Feet
Additions Industrial $ Total Project Cost X $95.00 per Square Feet
Additions Residential $ Total Project Cost X $80.00 per Square Feet
Alterations Commercial $ Total Project Cost X $85.00 per Square Feet
Alterations Industrial $ Total Project Cost X $85.00 per Square Feet
Alterations Residential $ Total Project Cost X $75.00 per Square Feet
Garage, Garage Under Finished Basement $ Total Project Cost X $55.00 per Square Feet
Farmer’s Porch $ Total Project Cost X $55.00 per Square Feet
Open Deck $ Total Project Cost X $40.00 per Square Feet
Sheds Over 64 Square Feet $ Total Project Cost X $40.00 per Square Feet
Electrical Permit Fees
Residential Top of Page
New Dwellings and Multi-Family, per Unit $200.00
Addition or Remodel $90.00
Service or Temporary Service $55.00
Swimming Pool, Residential, In-Ground $90.00
Swimming Pool, Residential, Above-Ground $70.00
Single Appliance $50.00
i.e., Generator, Water Heater, Heating System, Air Conditioning, Burglar/Fire Alarm
Solar Panels $90.00
Septic $50.00
Security System $50.00
Replace Service Meter $55.00
Reinspection Fee $50.00
Minimum Fee $50.00
Commercial
Commercial Total Service Amperage 200 Amp or Less = $150.00
201 Amp-400 Amp = $200.00
401 Amp and up = $250.00
Commercial Building-Estimate of Cost of Project Project Cost X 1.5% of Electrical Contract to $100,000.00
And $3.00 per $100,000.00 over $100,000.00
Commercial Minimum $90.00
Commercial Reinspection $50.00
When an inspection is requested and the work is not ready, the premises is locked or not accessible by means of a set of stairs or is disapproved.
* State Law requires that the installer of security systems maintain a security clearance license through the Department of Public Safety.
Plumbing and Gas Permit Fees
New Residential Plumbing Top of Page
First Fixture $120.00
Each Additional Fixture $15.00
Existing Residential Plumbing
First Fixture $60.00
Each Additional Fixture $15.00
Replacement Hot Water Heater (Residential) $35.00
New Commercial Plumbing
First Fixture $150.00
Each Additional Fixture $20.00
Existing Commercial Plumbing
First Fixture $120.00
Each Additional Fixture $20.00
Replacement Hot Water Heater (Commercial) $45.00
New Residential Gas
First Fixture $120.00
Each Additional Fixture $15.00
Existing Residential Gas
First Fixture $60.00
Each Additional Fixture $15.00
Replacement Hot Water Heater (Residential) $35.00
New Commercial Gas
First Fixture $150.00
Each Additional Fixture $20.00
Existing Commercial Gas
First Fixture $120.00
Each Additional Fixture $20.00
Replacement Hot Water Heater (Commercial) $45.00
Sheet Metal Permit Fees
Residential Fee $10.00 per $1,000.00 with a $40.00 Minimum Permit Fee Top of Page
Commercial Fee $12.00 per $1,000.00 with an $80.00 Minimum Permit Fee
Fire Sprinkler Permit Fees
Residential Fee $10.00 per $1,000.00 with a $40.00 Minimum Permit Fee Top of Page
Commercial Fee $12.00 per $1,000.00 with an $80.00 Minimum Permit Fee
Tent Permit Fees
$10.00 per $1,000.00 with a $40.00 Minimum Permit Fee Top of Page